About Siti Najjiya Mingu
My idea is,
we should introduce or implement technology of 'Smart Detector' in the building.
this related to the all energy production in building like air conditioning, fan, light, and so own. this smart detector work to detect when the power should off or on it activity. it also must smart in detected whether, people, and thermal comfort.
instead of given choice, authorities should make it as rules which everyone(developer/contractor/investment/residential) must obey. But, the first step of implementation and introduction to this new implementation, authorities must contribute 40-60% either in form of money,services or consultation so that it easy for people to accept the changes.
to be contineu...
Featured articles and news
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.